CAST STONE FOR DICKIES ARENA SUPPORT BUILDING

The Phase One of the Dickies Arena project is for outside support building to the arena access. This part of the building uses extensive custom fabricated cast stone (dry, vibrant-tamp).

 

The cast stone in this building matches with the architectural wet-precast and GFRC (glass fiber reinforced concrete) stone products used in other parts of the arena.

 

See this video with more details on this phase of the project:


 

 



 


  • Christus Spohn Shoreline Hospital: 12,000+ linear feet of the architectural stone banding accentuate windows at every level of the pavilion.  > MORE